{"id":12786,"date":"2013-07-11T10:43:20","date_gmt":"2013-07-11T09:43:20","guid":{"rendered":"http:\/\/www.urban75.org\/blog\/?p=12786"},"modified":"2013-07-11T10:51:02","modified_gmt":"2013-07-11T09:51:02","slug":"photos-londons-cheesegrater-skyscraper-topped-out-and-due-to-open-next-year","status":"publish","type":"post","link":"https:\/\/www.urban75.org\/blog\/photos-londons-cheesegrater-skyscraper-topped-out-and-due-to-open-next-year\/","title":{"rendered":"Photos: London&#8217;s Cheesegrater skyscraper topped out and due to open next year"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"12787\" data-permalink=\"https:\/\/www.urban75.org\/blog\/photos-londons-cheesegrater-skyscraper-topped-out-and-due-to-open-next-year\/olympus-digital-camera-571\/\" data-orig-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-17.jpg\" data-orig-size=\"620,465\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;URBAN75.COM&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1372607224&quot;,&quot;copyright&quot;:&quot;URBAN75@GMAIL.COM&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;OLYMPUS DIGITAL CAMERA&quot;}\" data-image-title=\"London&amp;#8217;s Cheesegrater skyscraper topped out and due to open next year\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-17.jpg\" class=\"alignnone size-full wp-image-12787\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-17.jpg\" width=\"620\" height=\"465\" srcset=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-17.jpg 620w, https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-17-300x225.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/p>\n<p>Currently under construction but nearing completion is this striking new skyscraper at\u00a022 Leadenhall Street.<\/p>\n<p>Designed by Richard Rogers and developed by British Land and Oxford Properties, the building features a distinctive tapered glass fa\u00e7ade on one side, implemented\u00a0to preserve a protected view of St. Paul&#8217;s Cathedral from Fleet Street.<\/p>\n<p>Such is the angle of the wedge shape that each floor is 75cm less on the southern side than the one below it.<\/p>\n<p><!--more--><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"12788\" data-permalink=\"https:\/\/www.urban75.org\/blog\/photos-londons-cheesegrater-skyscraper-topped-out-and-due-to-open-next-year\/olympus-digital-camera-572\/\" data-orig-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-02.jpg\" data-orig-size=\"620,465\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;URBAN75.COM&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1372606310&quot;,&quot;copyright&quot;:&quot;URBAN75@GMAIL.COM&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;OLYMPUS DIGITAL CAMERA&quot;}\" data-image-title=\"London&amp;#8217;s Cheesegrater skyscraper topped out and due to open next year\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-02.jpg\" class=\"alignnone size-full wp-image-12788\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-02.jpg\" width=\"620\" height=\"465\" srcset=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-02.jpg 620w, https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-02-300x225.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/p>\n<p>Known as &#8216; The Cheesegrater&#8217; on account of its distinctive wedge shape, Peter Rees, chief planning officer of the City of London, claims to have originated the name, telling\u00a0<a href=\"http:\/\/www.guardian.co.uk\/artanddesign\/2013\/jun\/16\/cheesegrater-leadenhall-building-richard-rogers\" target=\"_blank\">The Guardian<\/a>:When I first saw a model of the building, I told Richard Rogers I could imagine his wife, Ruthie, using it to grate parmesan. I don&#8217;t think he was too happy, but it stuck.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"12843\" data-permalink=\"https:\/\/www.urban75.org\/blog\/photos-londons-cheesegrater-skyscraper-topped-out-and-due-to-open-next-year\/cheesegreater-tower\/\" data-orig-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegreater-tower.jpg\" data-orig-size=\"620,443\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;URBAN75@GMAIL.COM&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"Photos: London&amp;#8217;s Cheesegrater skyscraper topped out and due to open next year\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegreater-tower.jpg\" class=\"alignnone size-full wp-image-12843\" alt=\"Photos: London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegreater-tower.jpg\" width=\"620\" height=\"443\" srcset=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegreater-tower.jpg 620w, https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegreater-tower-300x214.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/p>\n<p><a href=\"http:\/\/www.bbc.co.uk\/news\/uk-england-london-22958110\" target=\"_blank\">Topped out last month<\/a> and due to open next year, the\u00a0225 m (737\u00a0ft)-tall Leadenhall Building will hold 48 floors and offer 908,730 sq ft of floor space (which isn&#8217;t a great deal of space, given its height).<\/p>\n<p>The building seems to have quickly picked up pre-let agreements, with 51% of the space snapped up, with the largest chunks going to Man Utd shirt sponsors Aon, who are shifting their global HQ from Chicago, USA, and by underwriting firm Amlin.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-10.jpg\" width=\"620\" height=\"465\" \/><\/p>\n<p>Unusually, the skyscraper is jacked 30 metres up in the air at the base, providing a large, quasi-public \u00a0space beneath, complete with lawns, trees, cafes, benches and paved areas (see render below).<\/p>\n<p><img decoding=\"async\" class=\"bbCodeImage LbImage\" alt=\"[IMG]\" src=\"http:\/\/www.willfox.com\/images\/skyscrapers\/122leadenhall\/5.jpg\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-01.jpg\" width=\"620\" height=\"465\" \/><\/p>\n<p>The Cheesegrater rising behind the Bank Of England. If you ignore the\u00a0Heron Tower\u2019s spire, it&#8217;s the\u00a0\u00a0the tallest building in the Square Mile and will cost an estimated <a href=\"http:\/\/www.constructionenquirer.com\/2010\/10\/25\/deal-to-build-350m-cheese-grater-imminent\/\" target=\"_blank\">\u00a3340m<\/a>.<\/p>\n<p>Skyscraper News describes the building style as\u00a0<a href=\"http:\/\/www.skyscrapernews.com\/buildings.php?id=49\" target=\"_blank\">Structural Expressionist<\/a>, which is a new one on me.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-05.jpg\" width=\"620\" height=\"407\" \/><\/p>\n<p>Formerly occupied by a dour 14-storey 1969 tower block, the site was cleared by December 2009 and British Land had originally aimed to complete the scheme by 2011, but the project stalled\u00a0due to the financial crisis.<\/p>\n<p>Revived in October 2010, it&#8217;s on track for opening in 2014.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"12791\" data-permalink=\"https:\/\/www.urban75.org\/blog\/photos-londons-cheesegrater-skyscraper-topped-out-and-due-to-open-next-year\/olympus-digital-camera-575\/\" data-orig-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-13.jpg\" data-orig-size=\"620,465\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;URBAN75.COM&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1372528286&quot;,&quot;copyright&quot;:&quot;URBAN75@GMAIL.COM&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;OLYMPUS DIGITAL CAMERA&quot;}\" data-image-title=\"London&amp;#8217;s Cheesegrater skyscraper topped out and due to open next year\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-13.jpg\" class=\"alignnone size-full wp-image-12791\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-13.jpg\" width=\"620\" height=\"465\" srcset=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-13.jpg 620w, https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-13-300x225.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"12792\" data-permalink=\"https:\/\/www.urban75.org\/blog\/photos-londons-cheesegrater-skyscraper-topped-out-and-due-to-open-next-year\/olympus-digital-camera-576\/\" data-orig-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-12.jpg\" data-orig-size=\"620,407\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;URBAN75.COM&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1372528237&quot;,&quot;copyright&quot;:&quot;URBAN75@GMAIL.COM&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;OLYMPUS DIGITAL CAMERA&quot;}\" data-image-title=\"London&amp;#8217;s Cheesegrater skyscraper topped out and due to open next year\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-12.jpg\" class=\"alignnone size-full wp-image-12792\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-12.jpg\" width=\"620\" height=\"407\" srcset=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-12.jpg 620w, https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-12-300x196.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/p>\n<p>The Gherkin reflected on to the Cheesegrater.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"12795\" data-permalink=\"https:\/\/www.urban75.org\/blog\/photos-londons-cheesegrater-skyscraper-topped-out-and-due-to-open-next-year\/olympus-digital-camera-579\/\" data-orig-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-09.jpg\" data-orig-size=\"620,465\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;URBAN75.COM&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1372528109&quot;,&quot;copyright&quot;:&quot;URBAN75@GMAIL.COM&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;OLYMPUS DIGITAL CAMERA&quot;}\" data-image-title=\"London&amp;#8217;s Cheesegrater skyscraper topped out and due to open next year\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-09.jpg\" class=\"alignnone size-full wp-image-12795\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-09.jpg\" width=\"620\" height=\"465\" srcset=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-09.jpg 620w, https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-09-300x225.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"12796\" data-permalink=\"https:\/\/www.urban75.org\/blog\/photos-londons-cheesegrater-skyscraper-topped-out-and-due-to-open-next-year\/olympus-digital-camera-580\/\" data-orig-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-08.jpg\" data-orig-size=\"620,465\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;URBAN75.COM&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1372527895&quot;,&quot;copyright&quot;:&quot;URBAN75@GMAIL.COM&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;OLYMPUS DIGITAL CAMERA&quot;}\" data-image-title=\"London&amp;#8217;s Cheesegrater skyscraper topped out and due to open next year\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-08.jpg\" class=\"alignnone size-full wp-image-12796\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-08.jpg\" width=\"620\" height=\"465\" srcset=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-08.jpg 620w, https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-08-300x225.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/p>\n<p>Steel trusses at the narrow top of the tower.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"12797\" data-permalink=\"https:\/\/www.urban75.org\/blog\/photos-londons-cheesegrater-skyscraper-topped-out-and-due-to-open-next-year\/olympus-digital-camera-581\/\" data-orig-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-07.jpg\" data-orig-size=\"620,407\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;URBAN75.COM&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1372527892&quot;,&quot;copyright&quot;:&quot;URBAN75@GMAIL.COM&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;OLYMPUS DIGITAL CAMERA&quot;}\" data-image-title=\"London&amp;#8217;s Cheesegrater skyscraper topped out and due to open next year\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-07.jpg\" class=\"alignnone size-full wp-image-12797\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-07.jpg\" width=\"620\" height=\"407\" srcset=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-07.jpg 620w, https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-07-300x196.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"12800\" data-permalink=\"https:\/\/www.urban75.org\/blog\/photos-londons-cheesegrater-skyscraper-topped-out-and-due-to-open-next-year\/olympus-digital-camera-584\/\" data-orig-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-04.jpg\" data-orig-size=\"620,465\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;URBAN75.COM&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;1372522135&quot;,&quot;copyright&quot;:&quot;URBAN75@GMAIL.COM&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;OLYMPUS DIGITAL CAMERA&quot;}\" data-image-title=\"London&amp;#8217;s Cheesegrater skyscraper topped out and due to open next year\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-04.jpg\" class=\"alignnone size-full wp-image-12800\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-04.jpg\" width=\"620\" height=\"465\" srcset=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-04.jpg 620w, https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-04-300x225.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-15.jpg\" width=\"620\" height=\"407\" \/><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-16.jpg\" width=\"620\" height=\"389\" \/><\/p>\n<p>From left to right: the <a href=\"https:\/\/www.urban75.org\/blog\/walkie-talkie-tower-at-20-fenchurch-street-city-of-london-nears-completion-as-work-starts-on-europes-highest-roof-garden\/\">Walkie Talkie<\/a>, Cheesgerater, <a href=\"https:\/\/www.urban75.org\/blog\/heron-tower-skyscraper-110-bishopsgate-london\/\">The Heron<\/a> and The Gherkin towers.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" data-attachment-id=\"12834\" data-permalink=\"https:\/\/www.urban75.org\/blog\/photos-londons-cheesegrater-skyscraper-topped-out-and-due-to-open-next-year\/cheesegrater-skyscraper-london-18\/\" data-orig-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-18.jpg\" data-orig-size=\"620,360\" data-comments-opened=\"1\" data-image-meta=\"{&quot;aperture&quot;:&quot;0&quot;,&quot;credit&quot;:&quot;&quot;,&quot;camera&quot;:&quot;&quot;,&quot;caption&quot;:&quot;&quot;,&quot;created_timestamp&quot;:&quot;0&quot;,&quot;copyright&quot;:&quot;&quot;,&quot;focal_length&quot;:&quot;0&quot;,&quot;iso&quot;:&quot;0&quot;,&quot;shutter_speed&quot;:&quot;0&quot;,&quot;title&quot;:&quot;&quot;}\" data-image-title=\"London&amp;#8217;s Cheesegrater skyscraper topped out and due to open next year\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-18.jpg\" class=\"alignnone size-full wp-image-12834\" alt=\"London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-18.jpg\" width=\"620\" height=\"360\" srcset=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-18.jpg 620w, https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-18-300x174.jpg 300w\" sizes=\"auto, (max-width: 620px) 100vw, 620px\" \/><\/p>\n<p>View from Brixton Hill.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"Photos: London's Cheesegrater skyscraper topped out and due to open next year\" src=\"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/london-skyscrapers.jpg\" width=\"620\" height=\"407\" \/><\/p>\n<p>How the tower compares to other London skyscrapers [from <a href=\"http:\/\/skyscraperpage.com\/\" target=\"_blank\">skyscraperpage.com<\/a>].<\/p>\n<p>More: \u00a0<a href=\"http:\/\/www.urban75.net\/forums\/threads\/the-cheesegrater-tower-starts.267777\/\" target=\"_blank\">Discuss The Cheesegrater on urban75 forums<\/a><\/p>\n<p>[<a href=\"http:\/\/www.theleadenhallbuilding.com\/specification\" target=\"_blank\">Official specs for the building<\/a>]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Currently under construction but nearing completion is this striking new skyscraper at\u00a022 Leadenhall Street. Designed by Richard Rogers and developed by British Land and Oxford Properties, the building features a &hellip; <\/p>\n","protected":false},"author":2,"featured_media":12787,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[194,17,193],"tags":[199,383,351],"class_list":["post-12786","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-london-features","category-photos","category-places","tag-architecture","tag-cheesegrater","tag-skyscraper"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/www.urban75.org\/blog\/wp-content\/uploads\/2013\/07\/cheesegrater-skyscraper-london-17.jpg","jetpack_shortlink":"https:\/\/wp.me\/pQI7P-3ke","jetpack_sharing_enabled":true,"jetpack_likes_enabled":true,"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.urban75.org\/blog\/wp-json\/wp\/v2\/posts\/12786","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.urban75.org\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.urban75.org\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.urban75.org\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.urban75.org\/blog\/wp-json\/wp\/v2\/comments?post=12786"}],"version-history":[{"count":10,"href":"https:\/\/www.urban75.org\/blog\/wp-json\/wp\/v2\/posts\/12786\/revisions"}],"predecessor-version":[{"id":13204,"href":"https:\/\/www.urban75.org\/blog\/wp-json\/wp\/v2\/posts\/12786\/revisions\/13204"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.urban75.org\/blog\/wp-json\/wp\/v2\/media\/12787"}],"wp:attachment":[{"href":"https:\/\/www.urban75.org\/blog\/wp-json\/wp\/v2\/media?parent=12786"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.urban75.org\/blog\/wp-json\/wp\/v2\/categories?post=12786"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.urban75.org\/blog\/wp-json\/wp\/v2\/tags?post=12786"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}